Foundation Work: One Third of the Way There

Foundation Work: One Third of the Way There

“Second verse, same as the first,” right? We’re continuing the work around the home’s foundation, and so far every corner we’ve opened—about 12 to 24 inches deep—has needed to be rebuilt. The walls aren’t too bad – things reamin solid after the first row or two (below grade).

We’re now about one-third of the way around the house. The goal is to finish by mid-September, leaving plenty of time for the mortar to cure before cold weather arrives